The second attempt this month to lunch the atlantis that
carries the European lab to the space was canceled due to an emergency engine
cutoff system part need to be repeared because of malfunction, that is an other
delay for the European space permanent laboratory to be launched
The flight was set by Nasa to be done after the 10th January,
depend on the time that will take the engineers to repair the malfunction, they
do believe that the problem maybe the connector that relays electrical signals
from the sensors that resides in the fuel tank,
Saturday they will remove the suspected part and will be
sent to the marshall space flight center in Alabama to be analyzed, after fixed, NASA may decide to
test the repaired connector by filling the shuttle's fuel tank with super cold
propellants in a practice run before getting ready to launch Europe's
long-awaited Columbus
module.